Duplicate a StoX process.
duplicateProcess(projectPath, modelName, processID, newProcessName = NULL)
The path to the StoX project, i.e., the folder of the project with the sub folders "input", "output" and "process". Can possibly be the path to a file inside the project folder.
The name of the model (possible values are "baseline", "analysis" and "report").
The ID of the process.
The name of the new process. The default is the name of the process to copy added "_copy".